[ad_1]
There is a lack of demand in the market and given the scenario its is imperative to scale down the production, the source said. RINL, which has an installed capacity of over 7.5 million tonnes per annum (MTPA), produced about 18,000 tonnes of hot metal on a daily basis.
There are three blast furnaces of 2.5 MTPA each at the plant. Keeping vital equipment like coke oven batteries, blast furnaces, among others, in running condition is very essential for steel plants.
[ad_2]
Source link